Connections Inside



The first photo was taken in the knee wall on the second floor. It shows the hole they made in our roof in order to connect the panels to the conduit that we installed during the original renovation project (far left corner). This conduit runs from here to the basement.
The second photo is of the inverter installed under the basement stairs. You can see the conduit (i.e., PVC pipe) in the upper right corner of the photo.